The roof of Deh va namak building, which is executed as a mosaic, and the rain penetrates through the materials and installation elements to the floor below
After T7 insulation:
T7 color insulation against humidity is done on the roof mosaics and roof walls.
Before implementing T7 insulation:
On the roof of the Zafar building, the heat of the coolers and the roof was annoying for the residents.
After T7 insulation:
T7 colored insulation against moisture has been done on the channels and coolers and also the roof floor.
Before implementing T7 insulation:
On the roof of the Vashqani Jamal Abad building, where water seeped into the floor below, it was annoying for the residents
After T7 insulation:
T7 color covering and insulation against humidity and water on the roof and walls on the existing mosaic
Before implementing T7 insulation:
Qom-Kahk Bushehr pipeline
After T7 insulation:
T7color covering and insulation for anti-corrosion and moisture insulation of pipelines
Before implementing T7 insulation:
The roof of Raja railway wagons
After T7 insulation:
T7 color covering and insulation against corrosion and humidity of the roof of the wagons
Before implementing T7 insulation:
The roof of the afarinesh building
After T7 insulation:
T7 covering and anti-moisture and waterproof color insulation of the roof and walls on the mosaic
Before implementing T7 insulation:
Metro wagon making
After T7 insulation:
T7 color covering and insulation against corrosion and humidity of the roof of the wagons
Before implementing T7 insulation:
Hot oil storage tanks
After T7 insulation:
T7 color covering and insulation against corrosion and moisture of hot oil tanks
Before implementing T7 insulation:
steel oil tanks
After T7 insulation:
T7 color covering and insulation against moisture and heat of concrete tanks
Before implementing T7 insulation:
The roof and facade of the Mirmosi building
After T7 insulation:
Moisture-proof and waterproof T7 color covering and insulation on the ceiling and side walls