Construction implementation projects

Before implementing T7 insulation:

The elevator chamber of the roof of a building in Motahari Street, Tehran, does not cope with moisture penetration during rains and poses a danger to the residents.

After T7 insulation:

With the use of T7 materials, moisture-proof and waterproof color covering and insulation was done for the roof and walls of the elevator chamber on the roof.

Before implementing T7 insulation:

Executive project of the olom haghaghi garden

After T7 insulation:

Anti-moisture color covering and insulation for shear walls that are exposed to moisture.

Before implementing T7 insulation:

The concrete water tank of Chanbazan Park, where the damaged concrete was causing water leakage

After T7 insulation:

Damaged concrete repair and T7 insulation covering to control negative and positive pressure, moisture-proof colored insulation shielding of the wall, floor, ceiling and columns inside the concrete potable water tank of the complex

Before the implementation of T7 insulation:

the helicopter pad of the crisis headquarters under construction

After T7 insulation:

Implementation and construction of a helicopter pad with T7 waterproof materials and frost-resistant insulation

Before implementing T7 insulation:

Jajrud building jacuzzi

After T7 insulation:

T7 color covering and insulation is waterproof and creates positive pressure to prevent water penetration from the floor and walls of the jacuzzi

Before implementing T7 insulation:

The elevator hole in the main building of Bushehr Gas Administration and the problem of water infiltration

After T7 insulation:

Implementation of waterproof and negative pressure color T7 insulation to prevent water penetration into the hole

Before implementing T7 insulation:

Creation building ramp

After T7 insulation:

T7 color covering and insulation against moisture and waterproof ramp floor to prevent water penetration to the floor

Before implementing T7 insulation:

The ramp of the privatization organization

After implementing T7 insulation:

T7 color covering and insulation is waterproof and creates negative pressure to prevent water from penetrating the ramp walls

Before implementing T7 insulation:

Shurabad underpass septic tank

After implementing T7 insulation:

Concrete sealing with T7 materials and waterproof colored insulation and cover and creating negative pressure to prevent water penetration into the septic tank

Before implementing T7 insulation:

Implementation of the roof of Qaytiyeh pool

After implementing T7 insulation:

T7 anti-moisture and anti-corrosion color covering and insulation on concrete roof and metal beams to prevent vapors from penetrating the roof and rusting of metals

Before implementing T7 insulation:

The roof of the Mahalat revolving restaurant

After implementing T7 insulation:

The roof of the Mahalat revolving restaurant

Before implementing T7 insulation:

Tv production building

After implementing T7 insulation:

Repairing and covering waterproof T7 colored insulation on the existing metal gable roof

Before implementing T7 insulation:

Aviation building of the country’s airports

After implementing T7 insulation:

T7 colored covering and insulation against moisture and waterproofing the ramp floor to prevent water from penetrating the concrete floor

Before implementing T7 insulation:

Bardsir Sirjan steel water tank

After T7 insulation:

Creating resistance to the negative and positive pressure of water and soil and coating by T7  anti-moisture colored insulation for the wall and floor, ceiling and columns inside the concrete drinking water tank of the complex

Before implementing T7 insulation:

Calais ice tank

After implementing T7 insulation:

Repairing damaged concrete and creating negative and positive pressure by moisture-proof color Tsun insulation for the wall, floor, ceiling and columns inside the ice concrete tank of the complex

Before implementing T7 insulation:

Cold equipment of Kale company

After implementing T7 insulation:

Repairing damaged concrete and creating negative and positive pressure by T7 waterproof insulation for the wall and floor inside the cold equipment space of the complex

Before implementing T7 insulation:

Baran Hakimiya greenhouse

After implementing T7 insulation:

Repairing damaged concrete and creating negative and positive pressure by T7 colored insulation against moisture on the wall, floor, ceiling and columns inside the concrete water tank of the complex

Before implementing T7 insulation:

Atomic energy building

After implementing T7 insulation:

T7 color coating and insulation against moisture of the roof and roof walls implemented on the stone

Before implementing T7 insulation:

Factory water tanks

After implementing T7 insulation:

Repairing damaged concrete and creating negative and positive pressure by T7 color waterproof insulation for the wall and floor inside the concrete water tank